 |
|
Sports Science Building Liverpool John Moores University
With large new research fitness suites and associated changing facilities, the new Sports Science building will provide training for world class athletes as well as research facilities for community projects.
|
|
|
| |
 |
|
Engineering Workshops, Deeside College
New purpose designed workshops provide training facilities for engineering apprentices. The workshops, classrooms and administration facilities are linked to the existing college buildings via a covered atrium.
|
|
|
| |
 |
|
New Reception Building & Learning Resource Centre West Cheshire College
The new Reception Building for the Grange Campus of West Cheshire College has Reception Facilities, Coffee Bar, Student Services and a Shop on the ground floor with a Learning Resource Centre and associated office space above. |
|
|
| |
 |
|
Masterplan Design Strategy
for the University of Wales, Swansea
The objectives of the Masterplan are to create new places and strong links, to build on local identity, to develop sustainability and to encourage an inclusive approach. |
|
|
| |
 |
|
Aquinas College, Stockport
Following an accommodation masterplan, Phase 1 was completed in 2002, including the reuse and conversion of the existing gymnasium and dining hall to provide new art and CDT studios, IT rooms, workshops, exhibition space and laboratories. |
|
|
| |
 |
|
Relocation of Mount Primary School
Mount Primary school was relocated from its cramped site to a new site that became available after Wirral Borough Council built a new School for Weatherhead Girls Arts Media College under the PFI programme. |
|
|
| |
 |
|
Extension to Capenhust Primary School
An new classroom extension to a village primary school to accommodate pupils that were using a nearby village hall as a temporary teaching space. New stores and a secure additional entrance were also provided. |
|
|
| |
 |
|
Additions & Remodelling, Prestatyn High
School for Denbighshire County Council
Funded by the Popular Schools Initiative, the works included a new Library, new Business Studies and Maths Suite, re-modelling of the Art and CDT Block and were linked to the existing high school campus with a new ‘Internal Street’. |
|
|
| |